Demolition works of the piers n.10 and n.11 of the highway A10 Polcevera Viaduct (Ponte Morandi)

ATI per la demolizione del ponte  (Fratelli Omini Spa-Fagioli Spa-Ireos Spa-IPE Progetti Srl)

June 2019

Vibration monitoring of the viaduct surrounding structures during the blasting works.

On 28th of June 2019 during the demolition of the viaduct piers by controlled blasting GD Test has installed and managed the data of n.17 triaxial vibrometers finalized to monitor the dynamic effects induced to the buildings adjacent to the demolition  area of viaduct.